HomeMy WebLinkAboutAgenda Report - October 19, 2005 E-05AGENDA ITEM 9w5 &4& CITY OF LODI %W COUNCIL COMMUNICATION fM AGENDA TITLE: Adopt Resolution Awarding Contract for Lockeford Street Water Main (Church Street to Sacramento Street) and Olive Court Water Main Replacement (Pleasant Avenue to Church Street) Project to Arrow Construction Company, of Ceres, ($337,760) and Appropriating an Additional $108,000 for the Project MEETING DATE: October 19, 2005 PREPARED BY: Public Works Director RECOMMENDED ACTION: That the City Council adopt a resolution awarding the contract for the above project to Arrow Construction, of Ceres, in the amount of $337,760 and appropriate funds in accordance with the recommendation shown below. BACKGROUND INFORMATION: This project continues the City's Infrastructure Replacement Program to rehabilitate existing water infrastructure in the oldest parts of the City. This project integrates two smaller projects (Lockeford Street Water Main and Olive Court Water Main Replacement), both budgeted in the 2005/2006 fiscal year. The limits of this project are reflected on the attached exhibit. The project includes the installation of approximately 1,500 linear feet of 6 -inch and 8 -inch diameter water main and the abandonment of approximately 1,200 linear feet of existing 2 -inch and 3 -inch water main, including miscellaneous storm drain and surface improvements. The construction work is anticipated to take approximately three months. Plans and specifications for this project were approved on July 20, 2005. On September 21, 2005, sealed bids were opened with the following results: Bidder Engineering Estimate Arrow Construction Company Preston Pipelines, Inc. Location Bid $298,720 Ceres, CA $337,760 Milpitas, CA $380,000 The bid received from Arrow Construction Company is compliant with the City's plans and specifications, and the bidder possesses the required valid contractor's license. A bid summary is attached. Construction of this project is anticipated to start in November of this year. Inspection and construction management services will be performed by City Engineering staff. The work and materials associated with connecting the new water mains with the existing water mains will be performed by Water/Wastewater Division crews. Staff will provide project information to the public to inform the community about the construction schedule and project scope. The estimate used to establish the budget appropriation was generated from concept level plans. As the plans were refined, changes in scope were required to accommodate the congested utility corridor and APPROVED: r Kiihd, City Manager J'TROJECT51WATEMEastsideWaterWastowaterRehab\LockefordlliveWatermain\CAward.doc 10/13/2005 Adopt Resolution Awarding Contract for Lockeford Street Water Main (Church Street to Sacramento Street) and Olive Court Water Main Replacement (Pleasant Avenue to Church Street) Project to Arrow Construction Company, of Ceres, ($337,760) and Appropriating an Additional $108,000 for the Project October 19, 2005 Page 2 railroad tracks within the Lockeford Street right-of-way. As an example, the new water line along Lockeford Street must be located below the sidewalk on the north side of the street, which added to the project cost. These changes in scope added cost to the estimates used to establish the budget appropriation. The project estimate of $325,000 reflected on the Council Communication to approve plans and specifications at the July 20, 2005 Council meeting included the Engineer's Estimate ($298,720) plus a contingency of approximately 10%. It is anticipated the higher bid prices may be due to the current bidding climate. The difference between the contract and the requested appropriation includes funds for City -supplied water and wastewater materials, materials testing, and an allowance for contingencies arising from unforeseen changes in the work. FISCAL IMPACT: The proposed improvements will increase water system performance and reliability, thereby reducing operations and maintenance costs. FUNDING AVAILABLE: 2005/2006 Budget Appropriation: $150,000 Lockeford Street $122,000 Olive Court $272,000 Total Budget Appropriation Additional Appropriation Requested: $108,000 $380,000 Total Project Appropriation Water Utility Capital Outlay Fund Wastewater Utility Capital Outlay Fund Total Project Estimate: $350,000 (Includes additional appropriation of $78,000) $ 30,000 $380,000 i aures R. Krueger, Firgnce Director -- Richard C. Prima, Jr. Public Works Director Prepared by Charlie Swimley, Senior Civil Engineer RCPICESlpmf Attachments cc: Stephen Schwabauer, City Attorney F. Wally Sandelin, City Engineer Wes Fujitani, Senior Civil Engineer Sharon Welch, Senior Civil Engineer Paula Fernandez, Senior Traffic Engineer Joel Harris, Purchasing Officer Frank Beeler, Assistant WaterMastewater Superintendent George Bradley, Street Superintendent J'1PROJECTSIW ATE R\EastsideW aterWasiewaterRehab\LockefordOliveW atermainlCAward.doc 10113/2006 t_FOR PUBLICCITY OF LODI • . Lockeford Street Water Main (Church St. to Sacramento St.) Olive Court Water Main Replacement Project (Pleasant Ave. to Church St.) I Olive Ct. I I C0 I o � First St. a °" E T- CD I Q c ' U cCU I N L CU U � I De Force Ave. co I 0 I o Is C I - _ - Lockeford St. - — 1 = 200 Project Limits M:\0PEN\EXHIBITS\05X043.dwg, 1017/2005 11:47:39 AM, jpizzo Opinion of Probable Construction Cost City of Lodi Lockeford Street Water Main (Church St. to Sacramento St.) Olive Court Water Main (Pleasant Ave. to Church St.) Improvement Project 10/13/2005 Engineer's Estimate Arrow Construction Preston Pipelines Item No. Description Unit Quantity Unit Price Total Price Unit Price Total Price Unit Price Total Price A Miscellaneous 1 Mobilization LS 1 $ 20,000.00 $ 20,000.00 $ 5,000.00 $ 5,000.00 $ 5,270.00 $ 5,270.00 2 Construction Photography LS 1 $ 800.00 $ 800.00 $ 700.00 $ 700.00 $ 500.00 $ 500.00 3 Public Notification LS 1 $ 500.00 $ 500.00 $ 1,000.00 $ 1,000.00 $ 215.00 $ 215.00 4 Sheeting, shoring, sloping, and bracing or equivilent method conforming to applicable safety LS 1 $ 10,000.00 $ 10,000.00 $ 4,000.00 $ 4,000.00 $ 5,800.00 $ 5,800.00 5 Storm Water Pollution Prevention Plan LS 1 $ 600.00 $ 600.00 $ 3,500.00 $ 3,500.00 $ 2,000.00 $ 2,000.00 6 Storm Water Pollution Control LS 1 $ 4,000.00 $ 4,000.00 $ 1,500.00 $ 1,500.00 $ 3,275.00 $ 3,275.00 7 Asbuilt Drawings LS 1 $ 1,000.00 $ 1,000.00 $ 700.00 $ 700.00 $ 725.00 $ 725.00 Subtotal Miscellaneous $ 36,900.00 $ 16,400.00 $ 17,785.00 B Water Improvements 1 Install new 8" Water Main LF 722 $ 85.00 $ 61,370.00 $ 105.00 $ 75,810.00 $ 128.00 $ 92,416.00 2 Install new 6" Water Main LF 674 $ 70.00 $ 47,180.00 $ 125.00 $ 84,250.00 $ 124.00 $ 83,576.00 3 Install 1 " Water Service w/ Valve EA 26 $ 1,200.00 $ 31,200.00 $ 1,400.00 $ 36,400.00 $ 2,700.00 $ 70,200.00 4 Connect New Water Service to Buildings EA 27 $ 1,200.00 $ 32,400.00 $ 700.00 $ 18,900.00 $ 500.00 $ 13,500.00 5 Install 1" Extended Water Service EA 1 $ 2,500.00 $ 2,500.00 $ 4,700.00 $ 4,700.00 $ 4,300.00 $ 4,300.00 6 Install 8" Gate Valve EA 4 $ 1,100.00 $ 4,400.00 $ 2,600.00 $ 10,400.00 $ 1,250.00 $ 5,000.00 7 Install 6" Gate Valve EA 1 $ 675.00 $ 675.00 $ 2,300.00 $ 2,300.00 $ 1,100.00 $ 1,100.00 8 Install Fire Hydrant Assembly EA 1 $ 3,000.00 $ 3,000.00 $ 5,600.00 $ 5,600.00 $ 3,250.00 $ 3,250.00 Subtotal Water $ 182,725.00 $ 238,360.00 $ 273,342.00 C Storm Drain Improvements 1 Install new 12" Storm Drain LF 61 $ 80.00 $ 4,880.00 $ 165.00 $ 10,065.00 $ 139.00 $ 8,479.00 2 Install SICB EA 2 $ 1,200.00 $ 2,400.00 $ 1,500.00 $ 3,000.00 $ 1,675.00 $ 3,350.00 3 Abandon Existing Storm Drain LF 65 $ 25.00 $ 1,625.00 $ 25.00 $ 1,625.00 $ 35.00 $ 2,275.00 4 Install New Storm Drain Manhole EA 1 $ 2,500.00 $ 2,500.00 $ 6,300.00 $ 6,300.00 $ 3,600.00 $ 3,600.00 Subtotal Storm Drain Improvements $ 11,405.00 $ 20,990.00 $ 17,704.00 D Street & Landscape Improvements 1 Sidewalk Repair SF 3,115 $ 6.00 $ 18,690.00 $ 14.00 $ 43,610.00 $ 10.00 $ 31,150.00 2 Handicap Ramps EA 4 $ 7,500.00 $ 30,000.00 $ 3,000.00 $ 12,000.00 $ 1,600.00 $ 6,400.00 3 Replace Existing Landscape Improvements Damaged during Water service connection EA 27 $ 500.00 $ 13,500.00 $ 200.00 $ 5,400.00 $ 910.00 $ 24,570.00 4 Provisions for maintaining Temporary Access to Driveways LS 1 $ 4,500.00 $ 4,500.00 $ 500.00 $ 500.00 $ 6,300.00 $ 6,300.00 5 Remove and Replace Street Signs EA 1 $ 1,000.00 $ 1,000.00 $ 500.00 $ 500.00 $ 749.00 $ 749.00 Subtotal Street & Landscape Improvements $ 67,690.00 $ 62,010.00 $ 69,169.00 TOTAL $ 298,720.00 $ 337,760.00 $ 378,000.00 10/13/2005 RESOLUTION NO. 2005-220 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE CONTRACT FOR LOCKEFORD STREET WATER MAIN (CHURCH STREET TO SACRAMENTO STREET) AND OLIVE COURT WATER MAIN REPLACEMENT (PLEASANT AVENUE TO CHURCH STREET) PROJECT, AND FURTHER APPROPRIATING ADDITIONAL FUNDS FOR THE PROJECT WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on September 21, 2005, at 11:00 a.m., for the Lockeford Street Water Main (Church Street to Sacramento Street) and Olive Court Water Main Replacement (Pleasant Avenue to Church Street) Project, described in the specifications therefore approved by the City Council on July 20, 2005; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as follows: Biddle Location BLd Engineering Estimate $ 298,720 Arrow Construction Company Ceres, CA $ 337,760 Preston Pipelines, Inc. Milpitas, CA $ 380,000 WHEREAS, the City Manager recommends award of the contract for the Lockeford Street Water Main (Church Street to Sacramento Street) and Olive Court Water Main Replacement (Pleasant Avenue to Church Street) Project to Arrow Construction Company, of Ceres, California, in the amount of $337,760; and WHEREAS, the City Manager further recommends appropriating additional funds in the amount of $108,000 as follows: Water Utility Capital Outlay Fund $78,000 Wastewater Utility Capital Outlay Fund $30,000 NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby award the contract for Lockeford Street Water Main (Church Street to Sacramento Street) and Olive Court Water Main Replacement (Pleasant Avenue to Church Street) Project to Arrow Construction Company, of Ceres, California, in the amount of $337,760; and BE IT FURTHER RESOLVED that additional funds in the amount of $108,000 be appropriated as outlined above for this project: Dated: October 19, 2005 I hereby certify that Resolution No. 2005-220 was passed and adopted by the City Council of the City of Lodi in a regular meeting held October 19, 2005, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and Mayor Beckman NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None USAN J. BLA4TON City Clerk 2005-220