HomeMy WebLinkAboutAgenda Report - July 20, 2005 E-07AGENDA ITEM -1;&T47 r47 &IQ CITY OF LODI W COUNCIL COMMUNICATION TM AGENDA TITLE: Notification of Water and Wastewater Main Replacement Program — Project No. 2 Contract Change Order MEETING DATE: July 20, 2005 PREPARED BY: Public Works Director RECORMENDED ACTION: This item is for information only. No action is required. BACKGROUND INFORMATION: This information is being given to the City Council in accordance with the Contract Change Order policy approved by Resolution 85-173. One of the requirements of this policy is that we inform Council of all change orders where the total of a specific change order exceeds $25,000. The attached contract change order, approved by the City Manager, was in the amount of $182,196.56, which is 9.4% of the original contract. This project includes trenchless rehabilitation of approximately 12,100 lineal feet of existing 6 -inch wastewater main located in the backyards of homes and the installation of approximately 6,500 lineal feet of new water main in the public right-of-way, along with approximately 325 new water services. The contract change order work includes: 1. The installation of a new 8 -inch water main in Harold Street between Central Avenue and Garfield Street. The contractor was also paid for additional asphalt work in this block because patch paving was performed beyond the limits of the water main trench. 2. The replacement of a 6 -inch wastewater main in DeForce Street between Church Street and School Street with an 8 -inch wastewater main. This portion of DeForce Street is due for an overlay by our Street Division, and the wastewater work needed to be done before the new asphalt was placed. 3. Adjustments to the contract quantities for repairing sections of the wastewater main. 4. Adjustments to the contract quantities for extending new 1 -inch water services to the back lots of parcels. 5. Regrading and repaving the 300 block of Harold Street. The existing street area was not paved and the Project 2 contract included the installation of an 8 -inch water main in this area. The contractor was asked to regrade and repave areas outside of the trench area to improve the vehicular access to the homes in this block. The time of completion was adjusted to add 20 additional working days. FISCAL IMPACT: The upgrades to our water and wastewater systems will result in a slight decrease in the City's maintenance costs. FUNDING AVAILABLE: Contract Amount $1,994,167.20 Budgeted Fund: Water Capital Outlay � Wastewater Utility Capital Outlay R. Krueger,,- Finale Directo V, .,I^k4AWe1 -� Richard C. Prima, Jr. Public Works Director Prepared by Wesley K. Fujitani, Senior Civil Engineer Attachment cc: Senior Civil Engineer Swimley APPROVED: Blair King, Ci ager J:IPROJECTS\WATER\EastsideWaterWastewaterRehab\Project #21CC_CCO2.doC 7/8/2005 CITY OF LODI PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.2 Sheet 1 of 2 Date 6/1/05 Account No. See Distribution Below PROJECT: WATER AND WASTEWATER MAIN REPLACEMENT PROGRAM PROJECT NO. 2 CONTRACTOR: Crutchfield Construction You are directed to make the following changes or do the following work not included in the Plans and Specifications on this contract. ---------------------------------------------------------------------- Description of work to be done, estimate of quantities, and prices to be paid. Specify whether additional work is at contract price, agreed price, or force account. Unless otherwise stated, rates for rental of equipment cover only such time as equipment is actually used and no allowance will be made for idle time. 1. Regrade and repave/seal 300 block East Harold Street Acct: 181677 Agreed Upon Price $11,307.00 2. Replace 6 -inch WW Main in DeForce between Church Street and School St. with 8 -inch WW Main Acct: 171022 Agreed Upon Price $38,987.00 3. Install 8 -inch Water Main in Harold Street (Central to Garfield) including new water services and one FH assembly Acct: 181677 Agreed Upon Price $72,840.00 4. Perform additional asphalt concrete work on Harold Street (Central to Garfield) Acct: 181677 Agreed Upon Price $16,460.00 5. Reroute WW Main in Harold Street/Remove WWMH/Install Sweep Acct: 171022 Agreed Upon Price $ 5,102.56 6. Contract Item "B4. Point Repair -Open Cut' Increase Point Repair Quantity from 31 to 34 each Add 3 each at $2,000 each Acct: 171022 Agreed Upon Price $ 6,000.00 7.Contract Item "C8. Install 1 -inch Extended Water Service to Back Lot' Increase Quantity from 10 to 31 each. Add 21 each at $1,500 each Acct: 181677 Agreed Upon Price $31,500.00 Acct Distribution 171022: $ 66,549.56 181677: $115,647.00 PERCENT OF CONTRACT Original Contract Price $1,944,167.20 Total Cost of This Change Order NOT TO EXCEED $ 182,196.56 9.4% Previous Change Orders $ 63,900.12 Total Cost of All Change Orders to Date $ 246,096.68 12.7% Contract Price, Including All Change Orders, Will Be: $2,190,263.88 Time of completion will be adjusted as follows: Add 20 working days MM � CITY OF LODI PUBLIC WORKS DEPARTMENT CONTRACT CHANGE ORDER NO.2 Sheet 2 of 2 Date 6/1/05 PROJECT: WATER/ WASTEWATER MAIN REPLACEMENT PROGRAM PROJECT NO.2 CONTRACTOR: Crutchfield Construction Submitted By 6 - -C'5 Approval Recommended rtxs Date Approved, Public Works Director Date Approved, City Manager (Per Public Works Policies and Procedures, Administration 4.1) Date ' The undersigned contractor, having carefully considered the change proposed, agrees, if this proposal is approved, to provide all equipment, furnish all materials, except as otherwise noted above, perform all services necessary for the work above specified, and accept as full payment the prices shown above. ACCE-;P)T-'.D: Datei Contractor ea�-�icld If the contractor does not sign acceptance of this order, the contractor should refer to Section 4- 1.03A of the Standard Specifications regarding filing a written protest within the specified time. rc^m