AGENDA TITLE: Approve Plans and Specifications and Authorize Advertisement for Bids for the
Lockeford Street Water Main (Church Street to Sacramento Street) and the
Olive Court Water Main Replacement (Pleasant Avenue and Church Street) Project
MEETING DATE: July 20, 2005
PREPARED BY: Public Works Director
RECOMMENDED ACTION: That the City Council approve plans and specifications for the above project
and authorize advertising for bids. This project integrates two smaller projects
identified separately in the City's Capital Improvement Program that will be
bid as one overall project to take advantage of economy of scale.
BACKGROUND INFORMATION: The Water/Wastewater Main Replacement Program is systematically
replacing and, where needed, upgrading existing water and wastewater
infrastructure within the oldest areas of the City. The wastewater pipelines
are mostly constructed of terracotta or concrete pipe, and the waterlines are
largely constructed of small -diameter cast iron or steel pipe. The majority of these pipes are in need of
rehabilitation and/or replacement. This project continues implementation of the City's WaterNVastewater Main
Replacement Program.
The limits of the project (see attached map) are defined using the same ranking system used on prior projects.
The ranking system is based on a) input provided by maintenance staff most familiar with the water and
wastewater system and b) focus on areas containing substandard, 2 -inch and 3 -inch diameter water mains.
The existing 2 -inch and 3 -inch water mains within the project area will be abandoned and replaced with new
6 -inch and 8 -inch diameter mains. This project is unique since the existing railroad tracks in Lockeford Street
constrain the alignment of the new water main. To avoid conflicts with other utilities and to avoid crossing the
railroad tracks at each water service location, the new water main must be located under the existing sidewalk.
Accordingly, approximately 620 linear feet of dilapidated sidewalk will be replaced along this portion of the project.
The proposed water improvements will increase water pressure and fireflow service, as well as reduce
maintenance costs by enhancing access to the improvements.
The project includes the installation of approximately 1,500 linear feet of 6 -inch and 8 -inch diameter water
main; the abandonment of approximately 1,200 linear feet of existing 2 -inch and 3 -inch water maim including
miscellaneous wastewater and surface improvements.
FISCAL IMPACT: The proposed improvements will increase system reliability, thereby reducing
operation and maintenance costs.
FUNDING AVAILABLE: The money for this project will be coming from the Water and Wastewater
Funds. A request for appropriation of funds will be made at contract award.
Project Estimate: $325,000
Budgeted: 05106 fiscal year
Planned Bid Opening Date: Au st 2005
l'
Richard C. Prima, Jr. 17
Public Works Director
Prepared by Charlie Swimley, Senior Civil Engineer
Attachment
cc: Joel Harris, Purchasing Officer F, Wally Sandelin, City Engineer Paula Fernandez, Senior Traffic Engineer
Wes Fujitani, Senior Civil Engineer Sharon Welch, Senior Civil Engineer
APPROVED:
Blair King, Ci ger
,1 tPROJECTStWATERICPSA Lockeford Olive.doc 7/11/2005
VICINT'Y MAP
OLIVE CT & LOCKEFORD
WATERMAIN PROJECTS
M:\OPEN\EXHIBITS\05X023.dwg, 7/11/2005 10:59:57 AM, jpizzo
OLIVE CT
LOCKEFORD ST
WAT RMAIN
WATERMAIN
REPL EMENT
0PROJECT
PROJECT
MOKELUMNE
RIVER
y
~
O
~
rn
C9
�\
3 LAKE
I
TURNER RD
\OLIVE CT
LOCKEFORD ST\
U.P.R.R.
VI
ELM ST
PINE ST
PINE ST. >
w
Q
!p IN,
OAK ST
ILL.
J
c'9i1,
WALNUT ST
V
�l
LODI AVE
C.C.T.
ai
F'
rn
z
2
_
F
c
a
=
VINE ST
z
VINE ST
rn
W
z
W
?
Y
O
2
2
y
LU
U
HWY. 12
KETTLEMA LN
0
z
C✓�
w
J L(Z)
rn
CENTURY BLVD
Uj
w
3
O
J
O F <O
I
�y
6 MILES TO HWY 5
0
HARNEY LANE
2 /FOFi�
PUBLIC WORKS
z
O
U
O
I
w
O
I~
M:\OPEN\EXHIBITS\05X023.dwg, 7/11/2005 10:59:57 AM, jpizzo