Loading...
HomeMy WebLinkAboutAgenda Report - December 15, 2004 E-06AGENDA ITEM E�6 CITY OF LODI %V COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt resolution awarding the purchase of polemount and padmount transformers ($52,519.51) (EUD) MEETING DATE: December 15, 2004 PREPARED BY: Electric Utility Director RECOMMENDED ACTION: That the City Council adopt a resolution awarding the bids for the purchase of polemount and padmount transformers to the bidders whose proposals and equipment meet City of Lodi specifications, and whose transformers are expected to yield the lowest overall life -cycle costs: Polemounts: 15 ea 25kVA GE Supply Co, North Highlands $ 9,261.11 Padmounts: 2 ea 112.5 kVA Wesco Distribution, San Leandro $ 8,229.95 4 ea 150kVA Wesco Distribution, San Leandro $16,696.94 3 ea 300kVA Western States Electric, Portland, OR $18.321.51 $52,519.51 BACKGROUND INFORMATION: On May 21, 2003, the City Council authorized the Electric Utility Department and the Purchasing Division to advertise for bids as necessary to meet the Electric Utility Department's requirements for polemount and padmount transformers through the fiscal year ending June 30, 2005. On November 24, 2004 bids were opened for two sizes of polemount and three sizes of padmount transformers, and life -cycle costs were evaluated. (Life -cycle costs are the combined total of purchase price plus cost of operation based on estimated power loss during the projected life of the transformer.) Proposals are also evaluated on the basis of compliance with equipment and bid specifications. Failure to comply with both may lead to disqualification of the bid. A summary of the bid evaluation is attached as Exhibit A.. Staff recommends awarding only one size of polemount transformer, the 25kVA units to GE Supply Company, at this time. Staff anticipates returning to Council on January 5, 2005 with a recommendation for the 37.5kVA units. Some of the transformers are planned for use in a commercial development on Auto Center Drive, the Meridian development on Kettleman Lane, and for individual building pads in the Lowe's Center. The balance of the order will be used to replenish inventory of replacement units. FUNDING: Electric Utility Department 2003-2005 Financial Plan and Budget, Line Extensions, usiness Unit #161651, Page E-41 JiR Krueger, inane Director Alan N Vallow, E! ctric till Attachment: Exhibit A Prepared by Joel Hanis, Purc►a" Mar cc: EUD Electrical Engtnear APPROVED: '— Janet S eeter, Ififerim City Manager Exhibit A Polemount Transformers Page 1 Transformer Bid Evaluation Polemount November 24, 2004 Bid Item 1: 25kVA, 120/240 Volt, Single Phase Conventional Pole Vendor GE Supply Kuhlman Electric c/o Sierra Sales Howard Industries, Inc. WESCO Distribution, Inc. Central Moloney, Inc. c/o Stephens, McCarthy, Lancaster Western States Electric, Inc. General Pacific, Inc. Bid Opening: November 24, 2004 Tax (factor): 1.0775 Primary Winding: 12,000 Volt Line -to -Line No Load Loss $/watt: 3.75 Load Loss $/watt: 1.25 Unit Extended Price Price $ Price $ w/tax $ 573.00 8,595.00 9,261.11 610.00 9,150.00 9,859.13 603.00 9,045.00 9,745.99 542.00 8,130.00 8,760.08 632.00 9,480.00 10,214.70 644.00 9,660.00 10,408.65 744.87 11,173.05 12,038.96 Bid Item 2: 37.5kVA, 120/240 Volt, Single Phase Conventional Pole Number of units: 15 Number of units: 45 500 No Load Load 625 (Item 2 will be recommended for award on January 5, 2005) Loss Loss No Load Load Cost of Life Cycle Delivery Height Weight (watts) (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) (pounds) 56 309 3,150.00 5,793.75 8,943.75 18,204.86 14 22 361 65 256 3,656.25 4,800.00 8,456.25 18,315.38 8-10 32 394 65 269 3,656.25 5,043.75 8,700.00 18,445.99 10-12 32 383 63 346 3,543.75 6,487.50 10,031.25 18,791.33 8-10 38 317 63 288 3,543.75 5,400.00 8,943.75 19,158.45 16 36 401 61 288 3,431.25 5,400.00 8,831.25 19,239.90 11-13 37 379 61 237 3,431.25 4,443.75 7,875.00 19,913.96 10-12 41 489 Bid Item 2: 37.5kVA, 120/240 Volt, Single Phase Conventional Pole Number of units: 10 48 625 (Item 2 will be recommended for award on January 5, 2005) No Load Load Vendor Unit Extended Price Loss Loss No Load Load Cost of Life Cycle Delivery Height Weight Price $ Price $ w/tax $ (watts) (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) (pounds) Kuhlman Electric c/o Sierra Sales 739.00 7,390.00 7,962.73 98 333 3,675.00 4,162.50 7,837.50 15,800.23 8-10 32 494 Howard Industries, Inc. 758.00 7,580.00 8,167.45 93 340 3,487.50 4,250.00 7,737.50 15,904.95 10-12 36 480 Western States Electric, Inc. 716.00 7,160.00 7,714.90 82 414 3,075.00 5,175.00 8,250.00 15,964.90 11-13 37 448 Central Moloney, Inc. c/o Stephens, McCarthy, Lancaster 751.00 7,510.00 8,092.03 92 364 3,450.00 4,550.00 8,000.00 16,092.03 14 38 486 GE Supply 860.00 8,600.00 9,266.50 77 335 2,887.50 4,187.50 7,075.00 16,341.50 14 23 497 General Pacific, Inc. 859.14 8,591.40 9,257.23 78 338 2,925.00 4,225.00 7,150.00 16,407.23 10-12 41 567 WESCO Distribution, Inc. 718.00 7,180.00 7,736.45 98 443 3,675.00 5,537.50 9,212.50 16,948.95 8-10 38 449 Transformer Eval_b 11-24-2004 pole.xls 1 Exhibit A Padmount Transformers Page 1 of 2 Transformer Bid Evaluation Bid Opening: November 24, 2004 Padmount November 24, 2004 Unit Extended Tax (factor): No Load Loss $/watt: Load Loss $/watt: 1.0775 3.75 1.25 Load Primary Winding: 12,000 Volt, Delta Connected Load Bid Item 1: 112.5 kVA, 208Y/120 Volt, Three Phase Pad Life Cycle Delivery Height Number of units: 2 Price $ Price $ 65 >2.0 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance 4,335.00 Price $ Price $ w/tax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % WESCO Distribution 3,819.00 7,638.00 8,229.95 289 837 2,167.50 2,092.50 4,260.00 12,489.95 12-14 44 2.620 Howard Industries, Inc. 3,603.00 7,206.00 7,764.47 247 1242 1,852.50 3,105.00 4,957.50 12,721.97 7-9 45 2.300 Western States Electric, Inc. 4,149.00 8,298.00 8,941.10 251 946 1,882.50 2,365.00 4,247.50 13,188.60 11-13 50 3.950 G E Supply 4,170.00 8,340.00 83986.35 257 1116 1,927.50 2,790.00 4,717.50 13,703.85 15 48 2.940 General Pacific Inc. 4,340.78 8,681.56 9,354.38 233 1055 1,747.50 2,637.50 4,385.00 13,739.38 12-14 49 3.300 Central Moloney, Inc. (c/o Stephens, Mc... 7,014.00 14,028.00 15,115.17 170 1248 1,275.00 3,120.00 4,395.00 19,510.17 16 65 2.110 Bid Item 2: 150 kVA, 208Y/120 Volt, Three Phase Pad, Number of units: 4 65 >2.0 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % WESCO Distribution 3,874.00 15,496.00 16,696.94 289 1500 4,335.00 7,500.00 11,835.00 28,531.94 12-14 48 3.650 Howard Industries, Inc. 3,992.00 15,968.00 17,205.52 256 1629 3,840.00 8,145.00 11,985.00 299190.52 7-9 49 2.300 Western States Electric, Inc. 4,383.00 17,532.00 18,890.73 325 1205 4,875.00 6,025.00 10,900.00 29,790.73 11-13 50 3.130 General Pacific Inc. 4,624.23 18,496.92 199930.43 324 1223 4,860.00 6,115.00 10,975.00 309905.43 12-14 49 3.500 G E Supply 4,569.00 18,276.00 19,692.39 287 1398 4,305.00 6,990.00 11,295.00 30,987.39 15 51 3.410 Central Moloney, Inc. (c/o Stephens, Mc... 7,077.00 28,308.00 309501.87 252 1527 3,780.00 7,635.00 11,415.00 419916.87 16 65 2.020 Transformer Eval 11-24-2004 pads.xls 1 Exhibit A Padmount Transformers Page 2 of 2 Transformer Bid Evaluation Bid Opening: November 24, 2004 Padmount November 24, 2004 Tax (factor): No Load Loss $/watt: Load Loss $/watt: 1.0775 3.75 1.25 Primary Winding: 12,000 Volt, Delta Connected Bid Item 3: 300 kVA, 208/120 Volt, Three Phase Pad, Number of units: 3 65 >3.5 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Price $ Price $ w/tax $ Loss (watts) Loss (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) % Western States Electric, Inc. 5,671.00 17,013.00 18,331.51 537 2111 6,041.25 7,916.25 13,957.50 32,289.01 11-13 50 4.190 Howard Industries, Inc. 5,792.00 17,376.00 18,722.64 530 2157 5,962.50 8,088.75 14,051.25 32,773.89 7-9 55 3.800 WESCO Distribution 5,248.00 15,744.00 16,964.16 475 3067 5,343.75 11,501.25 16,845.00 33,809.16 12-14 44 4.390 General Pacific Inc. 6,294.83 18,884.49 209348.04 522 2187 5,872.50 8,201.25 14,073.75 349421.79 12-14 49 4.100 G E Supply 6,206.00 18,618.00 20,060.90 610 2831 6,862.50 10,616.25 17,478.75 37,539.65 15 55 3.640 Central Moloney, Inc. (c/o Stephens, Mc... 8,328.00 24,984.00 269920.26 320 3930 3,600.00 14,737.50 18,337.50 45,257.76 16 59 3.500 Transformer Eval 11-24-2004 pads.xls 2 RESOLUTION NO. 2004-273 A RESOLUTION OF THE LODI CITY COUNCIL AWARDING THE BIDS FOR THE PURCHASE OF POLEMOUNT AND PADMOUNT TRANSFORMERS WHEREAS, in answer to notice duly published in accordance with law and the order of this City Council, sealed bids were received and publicly opened on November 24, 2004, at 11:00 a.m. for the purchase of polemount and padmount transformers for the Electric Utility Department, described in the specifications therefore approved by the City Council on May 21, 2003; and WHEREAS, said bids have been compared, checked, and tabulated and a report thereof filed with the City Manager as shown on Exhibit A attached; and WHEREAS, the City Manager recommends the award of the bids for the various types and sizes of polemount and padmount transformers for the Electric Utility Department be made to the bidders whose proposal and equipment meet City of Lodi specifications and whose transformers are expected to yield the lowest overall life -cycle costs, listed as follows: Polemounts: 15 ea 25kVA GE Supply Co, North Highlands $ 9,261.11 Padmounts: 2 ea 112.5 kVA Wesco Distribution, San Leandro $ 8,229.95 4 ea 150kVA Wesco Distribution, San Leandro $16,696.94 3 ea 300kVA Western States Electric, Portland, OR $151 $52,519.51 NOW, THEREFORE, BE IT RESOLVED by the Lodi City Council that the award of the bids for the purchase of polemount and padmount transformers for the Electric Utility Department be and the same is hereby awarded to the lowest responsible bidders, as listed above, in the total amount of $52,519.51. Dated: December 15, 2004 I hereby certify that Resolution No. 2004-273 was passed and adopted by the City Council of the City of Lodi in a regular meeting held December 15, 2004, by the following vote: AYES: COUNCIL MEMBERS — Hansen, Hitchcock, Johnson, Mounce, and Mayor Beckman NOES: COUNCIL MEMBERS — None ABSENT: COUNCIL MEMBERS — None ABSTAIN: COUNCIL MEMBERS — None SUSAN J. BLACKSTON City Clerk 2004-273 Exhibit A Polemount Transformers Page 1 Transformer Bid Evaluation Polemount November 24, 2004 Ord rtem 1: 25kVA, 1201240 Volt, Single Phase Conventional Pole Vendor GE Supply Kuhlman Electric clo Siena Sales Howard Industries, Inc. WESCO Distribution, Inc. Central Moloney, Inc. Go Stephens, McCarthy, Lancaster Western States Electric, Inc. General Pacific, Inc. Bid Opening: November 24, 2004 Tax (factor): 1.0775 Primary Winding: 12,000 Volt Line -to -Line No Load Loss $/watt: 3.75 Load Loss 3hrvatt: 1.25 Unit Extended Prim Price; Price; wltax $ 573.00 8,595.00 9,261.11 610.00 9,150.00 9,658.13 603.00 9,045.00 9,745.99 542.00 8,130.00 8,700.68 632.00 9,480.00 10,214.70 644.00 9,680.00 18,408.65 744.87 11,173.05 12,030.96 Number of units: 15 45 500 No Load Load Number of units: 10 Loss Loss No Load Load Cast of Lite Cycle Delivery Height Weight (want) (watts) Loss value Loss value Losses $ Cost $ (weeks) (inches) (pounds) 56 309 3,150.00 5,793.75 8,943.75 18,204.86 14 22 $61 65 256 3,656.25 4,800.00 8,456.25 18,315.38 8-10 32 394 65 269 3,656.25 5,043.75 8,700.00 18,446.99 10-12 32 383 63 346 3,543.75 6,487.50 10,031.25 18,791.33 8-10 38 317 63 288 3,543.75 5,400.00 8,943.75 19,156.45 16 36 401 fit 288 3,431.25 5,400.00 8,831.25 19,239.90 11-13 37 379 61 237 3,431.25 4,443.75 7,875.00 19,913.96 10-12 41 489 Bid item 2: 37.5kVA, 1201240 Volt, Single Phase Conventional Pole Number of units: 10 (item 2 w11f be recommended for award on January 5, 2005) No Load Load Vendor Unit Extended Price Loss Loss No Load Load Cost of Life Cycle Delivery Price $ Price $ w4ax $ (visua) (watts) Loss value Loss value Losses; Cost $ (weeks) Kuhlman Electric do Sierra Sales 739.00 7,390.00 7,962.73 98 333 3,675.00 4,162.50 7,837.50 15,006.23 8-10 Howard Industries, Inc. 758.00 7,580.00 0,167.45 93 340 3,487.50 4,250.00 7,737.50 15,904.95 10-12 Western States Electric, Inc. 716.00 7,160.00 7,714.90 82 414 3,075.00 5,175,00 8,250.00 15,964.90 11-13 Central Moloney, Inc. clo Stephens, McCarthy, Lancaster 751.D0 7,510.00 8,092.03 92 364 3,450.00 4,550.00 8,000.00 16,092.93 14 GE Supply 860.00 8,600.00 9,266.50 77 335 2,887.50 4,187.50 7,075.00 16,341.50 14 General Pacific, Inc. 859.14 8,591.40 9,257.23 78 338 2,925.00 4,225.00 7,150.00 16,407.23 10-12 WESCO Distribution, Inc. 718.00 7,180.00 7,730.45 96 443 3,675.00 5,537.50 9,212.50 16,948.95 8-10 Transformer Eval_b 11-24-2004 poie.xls a 48 625 Height Weight (inches) (pounds) 32 494 36 480 37 448 38 486 23 497 41 567 38 449 e�� Exhibit A Padmount Transformers Page 1 of 2 Transformer Bid Evaluation Bid Opening: November 24, 2004 Padmount Tax (factor): 1.0775 Primary Winding: 12,000 Volt, Delta Connected 65 >2.0 Vendor Unit No Load Loss $Matt: 3.75 Load No Load Load Cost of Life Cycle Delivery Height November 24, 2004 Prion $ Load Loss $hvatt: 1.25 Lass value Loss value Losses $ Cost $ (weeks) (Inches) % Bid Item 1: 112.5 kVA, 208YI120 Volt, Three Phase Pad 3,874.00 15,496.00 16,696.94 Number of units: 2 4,335.00 7,500.00 65 2--2.0 Vendor Unit Extended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance 7-9 Price $ Price $ wltax $ Lasa (watts) Loss (watts) Loss value Loss value Losses $ cost $ (weeks) (inches) % YYESCO Distribution 3,819.00 7,638.00 8,229.95 289 837 2,167.50 2,092.50 4,260.00 12,489.95 12-14 44 2.620 Howard Industries, Inc. 3,603.00 7,206.00 7,764.47 247 1242 1,852.50 3,105.00 4,957.50 12,721.97 7-9 45 2.300 Western States Electric, Inc. 4,149.00 8,298.00 8,941.10 251 946 1,682.50 2,365.00 4,247.50 13,198.80 11-13 50 3.950 G E Supply 4,170.00 8,340.00 8,966.35 257 1116 1,927.50 2,790.00 4,717.50 13,703.95 15 48 2.940 General Pacific Inc. 4,340.78 8,681.56 9,354.38 233 1055 1,747.50 2,637.50 4,385.00 13,739.38 12-14 49 3.300 Central Moloney, Inc. (do Stephens, Mo... 7,014.00 14,028.00 15,115.17 170 1248 1,275.00 3,120.00 4,395.00 19,510.17 16 65 2.110 Bid Item 2: 150 kVA, 208YI120 Volt, Three Phase Pad, Number of units: 4 65 >2.0 Vendor Unit Edended Price No Load Load No Load Load Cost of Life Cycle Delivery Height Impedance Prion $ Price $ wltax $ Loss (watts) Loss (watts) Lass value Loss value Losses $ Cost $ (weeks) (Inches) % WESCO Distribution 3,874.00 15,496.00 16,696.94 289 1500 4,335.00 7,500.00 11,835.00 28,531.94 12-14 48 3.650 Howard Industries, Inc. 3,992.00 15,968.00 17,205.52 256 1629 3,840.00 8,145.00 11,985.00 29,190.52 7-9 49 2.300 Western States Electric, Inc. 4,383.00 17,532.00 18,890.73 325 1205 4,875:00 6,025.00 10,900.00 29,790.73 11-13 50 3,130 General Pacific Inc. 4,624.23 18,496.92 19,930.43 324 1223 4,860.00 6,115.00 10,975.00 30,905.43 12-14 49 3.500 G E Supply 4,569.00 18,276.00 19,692.39 287 1398 4,305.00 6,990.00 11,295-00 30,987.39 15 51 3.410 Central Moloney, Inc, (do Stephens, Mc... 7,077.00 28,308.00 30,501.87 252 1527 3,780.00 7,635.00 11,415.00 41,916.87 16 65 2.020 Transformer Eval 11-24-2004 pads.xls 1 Exhibit A Padmount Transformers Page 2 of 2 Transformer Bid Evaluation Padmourtt November 24, 2004 Bid Opening: November 24, 2004 Tax (factor): 1.0776 Primary Winding: 12,000 Volt, Delta Connected No Load Loss U"ft: 3.75 Load Loss $!watt 1.25 Bid Item 3: 300 kVA, 2081120 Volt, Three Phase Pad, Delivery Height Impedance Cost $ Number of units: 3 Vendor Unit Extended Prioe No Load Load No Load Load Cost of 33,809.16 Price $ Price $ wAn $ Loss (waifs) Loss (watts) Loss value Loss value Losses $ Western Stales Electric, Inc. 5,671.00 17,013.00 18,331.51 537 2111 6,041.25 7,916.25 13,957.50 Howard industries, Inc. 5,792.00 17,376.00 18,722.64 530 2157 5,962.50 8,088.75 14,051.25 WESCO Distribution 5,248.00 15,744.00 18,984.18 475 3067 5,343.75 11,501.25 16,845.00 General Pacific Inc, 6,294.83 18,684.49 20,348.04 522 2187 5,872.50 8,201.25 14,073.75 G E Supply 6,206.00 18,618.00 20,060.90 610 2831 6,862.50 10,616.25 17,478.75 Central Moloney, Inc. (clo Stephens, Me... 8,328.00 24,984.00 26,920.26 320 3930 3,600.00 14,737.50 18,337.50 Transformer Eval 11-24-2004 pads.xls 2 65 >3.5 Life Cycle Delivery Height Impedance Cost $ (weeks) (inches) % 32,289-01 11-13 50 4.190 32,773.89 7-9 55 3.800 33,809.16 12-14 44 4.390 34,421.79 12-14 49 4.100 37,539.65 15 55 3.640 45,257.76 16 59 3.500