Loading...
HomeMy WebLinkAboutAgenda Report - November 17, 2004 E-07AGENDA ITEM E07 CITY OF LODI COUNCIL COMMUNICATION TM AGENDA TITLE: Adopt Resolution Authorizing City Manager to Authorize Payment for City of Lodi/Lodi Unified School District Wash Bay Engineering to T. Mitchell Engineers and Associates of Oakland (;20,000) and Appropriate Funds MEETING DATE: November 17, 2004 PREPARED BY: Public Works Director RECOMMENDED ACTION: That City Council adopt a resolution authorizing the City Manager to authorize payment for the City of Lodi/Lodi Unified School District Wash Bay Engineering to T. Mitchell Engineers and Associates of Oakland and appropriate funds as shown below. BACKGROUND INFORMATION: This project is a joint effort between the City of Lodi and the Lodi Unified School District (LUSD). The City of Lodi and LUSD will share the cost of the project. The City of Lodi has previously purchased the equipment ($151,455) and has been responsible for the engineering on this project. LUSD is overseeing construction and has committed to the funding of it. On November 15, 2000, the City Council approved a joint -use agreement with LUSD and entered into a design agreement with Booker Gery Hickman Architects. The project was designed and bid, however, the bids received were well over the amount of the available funding. At the April 16, 2003, meeting, the City Council rejected all bids and directed staff to redesign and rebid the project, allowing that the metal building/structure be either eliminated, reduced in scope, or bid as an alternate. As part of that effort, the City terminated its contract with Booker Gery Hickman Architects (after the architect for the project left) and, under advisement of the then City Manager, agreed to move forward with T. Mitchell Engineers to complete the project. T. Mitchell Engineers was selected for their familiarity with the project and project location (they were the engineering firm for the City of Lodi/LUSD CNG Project) and their willingness to accept the existing plans for modifications without requiring a complete re -design. This engineering work is now close to completion and staff is asking for authorization to pay the engineering firm for their work. FUNDING: Leated Appropriat' n: Transit Fund 1250 $20,000 mes R. Krueger, Finance Director Prepared by Tiffani M. Fink, Transportation Manager RCP/TF/pmf cc: Purchasing Officer Fleet and Facilities Manager Transportation Manager APPROVED: J:IPROJECTSITRANS Richard C. Prima, J Public Works Director Janet %.-Keeter, Interim City Manager 11!812004 RESOLUTION NO. 2004-244 A RESOLUTION OF THE LODI CITY COUNCIL AUTHORIZING THE CITY MANAGER TO AUTHORIZE PAYMENT FOR CITY OF LODI/ LODI UNIFIED SCHOOL DISTRICT WASH BAY ENGINEERING TO T. MITCHELL ENGINEERS AND ASSOCIATES, AND FURTHER AUTHORIZING APPROPRIATION OF FUNDS WHEREAS, this project is a joint effort between the City of Lodi and Lodi Unified School District and will share costs as outlined in the joint -use agreement between the City of Lodi and Lodi Unified School District approved on November 15, 2000; and WHEREAS, also on November 15, 2000, the City Council approved entering into a design agreement with Booker Gary Hickman Architects; and WHEREAS, the City of Lodi previously purchased the equipment in the amount of $151,455 and has been responsible for the engineering on this project; and WHEREAS, Lodi Unified School District is responsible for overseeing construction and has committed to funding the construction; and WHEREAS, at its April 16, 2003, meeting, the City Council rejected all bids and directed staff to redesign and rebid the project, allowing that the metal building/structure be either eliminated, reduced in scope, or bid as an alternate; and WHEREAS, the City terminated its contract with Booker Gery Hickman Architects (after the architect for the project left) and, under advisement of the then City Manager, agreed to move forward with T. Mitchell Engineers to complete the project because of its familiarity with the project and project location and its willingness to accept the existing plans for modifications without requiring a complete re- design; and WHEREAS, the engineering work is now close to completion and staff is asking for authorization to pay the engineering firm for its work. NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby authorize payment for City of Lodi/Lodi Unified School District Wash Bay Engineering to T. Mitchell Engineers and Associates, of Oakland, California; and BE IT FURTHER RESOLVED that the Lodi City Council hereby approves appropriating funds not to exceed $20,000 from Transit Fund 1250. Dated: November 17, 2004 I hereby certify that Resolution No. 2004-244 was passed and adopted by the City Council of the City of Lodi in a regular meeting held November 17, 2004, by the following vote: AYES: NOES: ABSENT: ABSTAIN: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and Mayor Hansen COUNCIL MEMBERS — None COUNCIL MEMBERS — None COUNCIL MEMBERS — None (Z� - -1b SUSAN J. BLACKSTON City Clerk 2004-244