AGENDA TITLE: Adopt a resolution approving plans and specification, authorizing advertisement for bids,
and further authorizing the City Manager to award or reject all bids for Blakely Park/Enze
Pool plastering, 1050 S. Stockton Street (not to exceed $45,000)(P&R)
MEETING DATE: November 17, 2004
PREPARED BY: Steve Dutra, Park Superintendent
RECOMMENDED ACTION: That the City Council adopt a resolution approving plans and
specifications, authorizing advertisement for bids, and further authorizing
the City Manager to award or reject all bids for Blakely Park/Enze Pool
plastering, 1050 S. Stockton Street (not to exceed $45,000).
BACKGROUND INFORMATION: In May/June of 1996 Enze Pool received a new hand laid fiberglass
coating. The contract was awarded to Aqua Pool and Spa_ In 2000, the
fiberglass started blistering and delaminating from the plaster pool shell. In
2001, the work was performed again. This time the contract was awarded
to Applied Fiberglass Systems due to the scope of the work and the necessity of performing the repair work in time
for the summer aquatic program. The cost of repairs was $33,000. Aqua Pool and Spa no longer does fiberglass
projects and Applied Fiberglass Systems is currently out of business. We again are experiencing delaminating.
Today, Enze Pool has approximately 1000 square feet of delaminated fiberglass. This encompasses most of the
shallow end of the pool. There are some small areas at the deep end of the pool that are starting to blister and
spread. Staff has contacted both fiberglass and plastering pool contractors for field inspections and discussions
about the project. It is staffs recommendation that Enze Pool be taken off line, the fiberglass removed, and a new
plaster shell be applied.
BID OFIRAW: December 1, 2004
FUNDING: Parks and Recreation Department Capital Account
Project Estimate: $45,000
Funding Appmvul:
es R. Krueger, lfiriai6e Director
TCG1SD:t1
Prepared by Steve Dutra, Park SuperintwWwo
cc: City Attorney
Purchasing Of kw
Tony o* ng
Parks and Recreation Director
APPROVED: Lr L,
Janet . Keefer, Interim City Manager
RESOLUTION NO. 2004-241
A RESOLUTION OF THE LODI CITY COUNCIL APPROVING
PLANS AND SPECIFICATIONS AND AUTHORIZING
ADVERTISEMENT FOR BIDS FOR BLAKELY PARK1ENZE POOL
PLASTERING, 1050 S. STOCKTON STREET, AND FURTHER
AUTHORIZING THE CITY MANAGER TO AWARD OR REJECT
THE BIDS UP TO $45,000
WHEREAS, in 1996, Enze Pool received a new hand -laid fiberglass coating, and in
2000, the fiberglass blistered and delaminated from the plaster pool shell; and
WHEREAS, in 2001, the work was redone at a cost of $33,000, and once again it is
experiencing the same delaminating problems; and
WHEREAS, due to the recurring problems, staff recommends that the Enze Pool be
taken offline, the fiberglass removed, and a new plaster shell applied.
NOW, THEREFORE, BE IT RESOLVED that the Lodi City Council does hereby approve
the plans and specifications and authorizes advertisement for bids for Blakely Park/Enze Pool
plastering, 1050 S. Stockton Street; and
BE IT FURTHER RESOLVED that the Lodi City Council further authorizes the City
Manager to award or reject the bids up to $45,000.
Dated: November 17, 2004
I hereby certify that Resolution No. 2004-241 was passed and adopted by the City
Council of the City of Lodi in a regular meeting held November 17, 2004, by the following vote:
AYES: COUNCIL MEMBERS — Beckman, Hitchcock, Howard, Land, and
Mayor Hansen
NOES: COUNCIL MEMBERS — None
ABSENT: COUNCIL MEMBERS — None
ABSTAIN: COUNCIL MEMBERS — None
SUSAN J. BLACK ON
City Clerk
2004-241